Product introduction
The electric fluorine lined ball valve is the key control valve of the pipeline system, regulating the fluid flow and pressure through the motor drive. During installation, ensure that the pipeline is smooth and the components are intact. Install the valve body, motor and wiring according to the steps, and test the function after commissioning. Attention should be paid to safe operation, corrosion prevention, environmental adaptability, regular maintenance and media restrictions.
Electric fluorine lined ball valve is a control valve commonly used in piping systems, with excellent corrosion resistance and reliable sealing. This paper will introduce the working principle, installation steps and matters needing attention of the electric fluorine lined ball valve in detail.
Working principle
The electric fluorine lined ball valve is driven by a motor to control the position of the ball, so as to adjust the fluid flow and pressure.
Its main working principle includes the following steps:
1, motor start-stop control: through external signals or manual operation, start and stop the motor to achieve the switching function.
2, sensor detection and feedback: the built-in sensor monitors the position of the sphere, and transmits the data to the control system through the feedback signal.
3, valve stem drive and Angle change: the motor drives the valve stem to rotate, so that the ball has a corresponding Angle change.
4, flow guidance and flow regulation: With the change of the ball Angle, the fluid forms a flow guide hole of different sizes in the channel, so as to adjust the flow and pressure.
Installation procedure
Correct installation is the key to ensure the normal operation of the electric fluorine lined ball valve.
Here are the installation steps:
1. Preparation: Clean the surface of the pipeline to ensure that it is smooth and free of impurities, and check whether the required installation parts are in good condition.
2. Install the valve body: Connect the electric fluorine lined ball valve with the corresponding interface of the pipeline, and fix it tightly by flange or thread connection.
3, connect the motor: according to the product instructions, the motor is correctly installed on the valve body, and firmly fixed and connected.
4, wiring connection: according to the circuit diagram of the electric fluorine lined ball valve and the control system for correct wiring connection.
5, commissioning test: After the completion of the installation, the function and performance of the electric fluorine lined ball valve is tested, and the parameter Settings are adjusted to meet the actual needs.
Matters needing attention
1, safe operation: in any maintenance, replacement parts or debugging process, be sure to cut off the power and take relevant safety measures.
2, anti-corrosion treatment: before the use of fluorine lined ball valves, in the pipeline coated with appropriate anti-corrosion materials to protect the surface of the pipeline.
3, environmental adaptability consideration: according to the actual situation to choose the appropriate model and specifications to ensure environmental adaptability and stability.
4. Maintenance: Regularly check the working status of the electric fluorine lined ball valve, clean up the internal accumulation and lubritate the moving parts to prevent failure.
5, temperature and medium limitations: ensure that the electric fluorine lined ball valve can work normally within the specified temperature range, and select the material suitable for the medium.
Electric fluorine lined ball valve plays an important role in the pipeline system. Understanding its working principle, correct installation and precautions are essential to ensure its normal operation. By following the installation steps and precautions, you can ensure that the electric fluorine lined ball valve can efficiently achieve the fluid control goal for a long time.
Name | Nominal diameter | Body material |
DN15-200 | fluorine-lined,Cast steel, stainless steel |
Product Advantages
|
Valve body Selected quality steel Burr free surface smooth and strong tension |
Internals The wall thickness is uniform and the real material has high hardness |
|
Technical parameter
3C Valve Category | industry | Structural form | Floating ball valve | Control mode | power-driven |
Applicable temperature | Normal temperature | Driving mode | power-driven | Connection form | Screw thread |
Applicable medium | water | Applicable industry | Environmental protection, agriculture, environmental protection water treatment, water conservancy, steel, medicine, water heating | Accessories available | Electric actuator |
Pressure environment | 2.5 MPa to 1.6 MPa |
Quality inspection equipment
Complete testing equipment to ensure product quality.
Packaging & Shipping
FAQ
1.What is the Minimum Order Quantity?
5~1000 pcs.And we also accpet sample orders.
2. Can you manufacture according to customer's samples?
According to samples, we can make drawing, tooling and sample
3.How long will it take to make new samples according to customer's drawing or sample?
Totally 20 days. 10 days for tooling and another 10 days for sample.